Optimized resource management for construction sites

Seamless fleet coordination, streamlined workforce planning, and maximized efficiency.

Our Story

When a construction company was losing time and money juggling equipment assignments on whiteboards and spreadsheets, we stepped in to turn their fleet management from heavy lifting into light work. Managing a construction fleet shouldn't be harder than operating the machines themselves, so we built a solution that works as reliably as their best equipment.

The challenge

Creating a platform to manage heavy equipment and workforce coordination for a construction company required addressing several critical pain points:

1. Inefficient Equipment Assignments - Manual processes for assigning equipment to sites caused delays and wasted resources, slowing down overall operations.

2. Untracked Service Intervals - The lack of a system to monitor maintenance schedules led to unexpected equipment breakdowns, resulting in costly downtime.

3. Suboptimal Workforce Scheduling - Poorly optimized schedules created bottlenecks and underutilized labor, affecting productivity on construction sites.

4. Payload Delivery Coordination - Route planning was inefficient, leading to missed deadlines and complications in logistics management.

This project wasn’t just about automation—it was about redefining how resources are managed to maximize efficiency and eliminate downtime. That’s #RebelStyle.

References

"Planning our fleet and workforce is now a breeze. Code Rebels saved us hours of manual work each week, and our equipment utilization has never been better."

Operations Manager

See our reviews:

Technology

Using Airtable, we built a platform that's as robust as the equipment it manages. Our solution matches the right machine to the right job automatically, tracks maintenance schedules to prevent costly breakdowns, and provides real-time route guidance to keep payloads moving. The system handles workforce scheduling with the precision of a laser level, turning resource management into a science.

Process

Week one established our blueprint for success. Weeks two and three saw us constructing the platform and implementing automation. By week four, we were testing in real conditions and rolling out a solution that would transform their operations.

Outcome

Our platform turned their operations from chaos into clockwork. Equipment utilization soared while downtime plummeted. Crew scheduling became seamless, and weekly planning that used to take hours now happens automatically. The result is a construction operation that runs as smoothly as their best-maintained equipment.

Get your app as
fast as 4 weeks

Get Estimation of your project

Let's start it #RebelStyle

Typeform link